REQUEST A QUOTE
Tell us about your facility
By submitting this form, you agree that T.W. Hicks may contact you about your request. See our Privacy Policy.
Prefer to talk? Call (940) 498-3444
TEXAS FOOD & BEVERAGE FACILITIES
Food-Grade Flooring for Texas Food & Beverage Facilities
Seamless urethane cement and resinous floors for washdown rooms, coolers, freezers, processing areas and packaging lines — chosen for the way your plant actually runs.
Systems matched zone by zone, not one floor for the whole building
Manufacturer data sheets your engineers and food-safety team can review
Work phased around your production schedule where your layout allows
40+ Years
of Industry Expertise
2,500+
Projects Completed
500M+
Sq. Ft. Installed
Woman-owned
Family-Operated
WHY THE FLOOR MATTERS
When a food plant floor fails, production feels it
Cracked, worn or delaminating floors can trap water and debris, make footing harder in wet areas and pull your maintenance team into repairs during production. In a food plant, the floor is part of your sanitation program, not just a surface.
The right system depends on what hits the floor, how you clean it, how hot or cold the room runs and what traffic it carries. We start there.
BY ZONE
Floors matched to each area of your plant
WASHDOWN
Wet processing and washdown rooms
Daily sanitation, hot water, cleaning chemicals and drains
PACKAGING
Bottling, filling and packaging lines
Sugars, syrups, acids and constant traffic
COLD
Coolers and freezers
Low temperatures, condensation and temperature swings at doors and transitions
DAIRY
Dairy processing
Lactic acid, milk sugars and clean-in-place chemicals
HEAT
Cook, fry and oven areas
Heat, fats and hot oils
DRY STORAGE
Dry storage, warehouses and docks
Forklifts, pallet jacks, impact and abrasion
Integral cove base and well-planned drain transitions help reduce open joints at the floor's edges, where water and debris tend to collect.
COMPARE SYSTEMS
Urethane cement or epoxy? It depends on the zone
| Factor | Urethane cement | Epoxy |
|---|---|---|
| Often considered for | Wet processing, hot-water washdown, coolers, freezers, cook areas | Drier areas such as packaging, dry storage, warehouses and corridors |
| Temperature swings | Generally better tolerance of thermal cycling and thermal shock | Generally lower tolerance of hot washdown and rapid temperature change |
| Relative cost | Usually higher | Usually lower |
Both are seamless resinous floors. They behave differently under heat, moisture and chemicals, so they usually suit different parts of a plant.
These are general tendencies. The exact product, its thickness and the manufacturer's published ratings decide what a floor can handle, and we review them with you before you commit.
3 SIMPLE STEPS
How a project starts
Tell us about your facility
Use the form or call. Share the areas involved, your products and cleaning routine, and your timing.
We talk through the scope
We follow up to ask questions, discuss the space and arrange the next steps for an accurate quote.
You get a recommendation by area
Systems, preparation and phasing options, with manufacturer documentation for your team to review.
Every facility is different, so we confirm schedules and cure times after we understand the space.
Running a plant outside the big metros?
Many Texas food and beverage facilities are in smaller towns and rural areas. If yours is one of them, include the town in your request and we'll tell you how we can help.
FAQ
Common Questions
-
Regulators generally set requirements for surfaces — smooth, durable and cleanable — rather than approving a specific floor. We recommend systems with manufacturer documentation your food-safety team can review against the rules and audits that apply to your facility.
-
Sometimes. Depending on your layout, ventilation and the system chosen, work may be phased room by room or around planned shutdowns. We discuss what's practical for your plant before scheduling.
-
Often, cracks, failed joints, damaged cove base and worn areas can be repaired or resurfaced. If the floor has lost its bond or water is getting underneath, replacement may be the better option. We'll talk through both.
-
The areas involved, approximate square footage, the products and cleaning chemicals the floor sees, temperature ranges and your timing. Photos of the current floor help too.
Still have a question about your plant?
Ready to talk about your floor?
Tell us about your facility, the areas involved and your timing. We'll follow up to discuss the next steps.